Armide report December 17th 2018

Armide report December 17th 2018


Photos of recent works undertaken

  • Main boom support deck eyes

  • Main boom support deck eyes

  • Mizzen mast bands at deck level

  • Helmsman’s console at aft end of starboard deck bench

  • mast wedges from the underside

  • Anchor davit bronze deck fitting

  • Anchor davit bronze deck fitting

  • Backstay backing brackets on the underside of the deck

  • Backstay backing brackets on the underside of the deck

  • Temperature checks at the stern gland during sea trials

  • Temperature checks at the stern gland during sea trials

  • Interior joinery details

  • Interior joinery details

  • Interior joinery details

  • Interior joinery details

  • Fore-cabin hatch mirror prior to installation

Leave a Reply