Armide report Nov 12th 2018

Armide report Nov 12th 2018


Photos of recent works undertaken

  • Door fitting between aft bathroom and the chart table / main saloon

  • Door fitting between aft bathroom and the chart table / main saloon

  • Door fitting between aft bathroom and the chart table / main saloon

  • Routering in the companionway steps for the bronze anti-slip strips

  • Finishing trim and details in the fore-cabin

  • Routering in the companionway steps for the bronze anti-slip strips

  • Finishing trim and details in the fore-cabin

  • Finishing trim and details in the fore-cabin

  • Door fitting between aft bathroom and the chart table / main saloon

  • Plug socket in owners cabin bathroom

  • Plug socket in owners cabin bathroom

  • Overhead ceiling light and copper tubing conduit

  • Initial checks of the stainless-steel anchor davit and related anchor positioning

  • Anti-chafe strip for the aft capping rail fairlead (port) installed and in operation

  • Initial checks of the stainless-steel anchor davit and related anchor positioning

  • Shaping the anti-chafe strip for the aft capping rail fairleads

  • Armide’s decks in the rain - with works continuing in the interior.

  • Initial checks of the stainless-steel anchor davit and related anchor positioning

Leave a Reply