Armide report Nov 5th 2018
Photos of recent works undertaken
-
Under deck view beneath electric winch
-
Under deck view beneath electric winch
-
New winches fitted to the aft deck
-
New winches fitted to the aft deck
-
Oak wiring conduit cover above the chart table
-
Oak wiring conduit cover above the chart table with vent slots in joinery panels
-
Chart table works nearing completion
-
Doors, fixtures and fittings installation
-
New winches fitted to the aft deck
-
Final adjustments to door in the main saloon
-
Ply template for the anti-chafe bronze at the aft fairleads on the capping rail (not final)
-
Bathroom teak grating prior to final installation
2768 false false false
Leave a Reply
You must be logged in to post a comment.