Armide report Nov 5th 2018

Armide report Nov 5th 2018


Photos of recent works undertaken

  • Under deck view beneath electric winch

  • Under deck view beneath electric winch

  • New winches fitted to the aft deck

  • New winches fitted to the aft deck

  • Oak wiring conduit cover above the chart table

  • Oak wiring conduit cover above the chart table with vent slots in joinery panels

  • Chart table works nearing completion

  • Doors, fixtures and fittings installation

  • New winches fitted to the aft deck

  • Final adjustments to door in the main saloon

  • Ply template for the anti-chafe bronze at the aft fairleads on the capping rail (not final)

  • Bathroom teak grating prior to final installation

Leave a Reply