Armide report Oct 29th 2018

Armide report Oct 29th 2018


Photos of recent works undertaken

  • Owners cabin bathroom door

  • Drilling the deck for an electric winch port side

  • Electric winch and control button installed starboard side

  • Installing door lock

  • Ply templates for under-deck winch brackets (to eventually be fabricated in bronze plate)

  • Electric winch and control button installed starboard side

  • Owners’ cabin bunk drawers

  • Doghouse lamp

  • Drilling the deck for an electric winch port side

  • Positioning of hand rail supports on the aft deck benches

  • Filling up with diesel and protecting the deck during filling

  • Oak façade and electronics in the captain’s cabin

  • Positioning of hand rail supports on the doghouse

  • Filling up with diesel and protecting the deck during filling

  • Waterline and ballast checks: with 720kgs added forward and 70kgs aft (replicating winches)

  • Waterline and ballast checks: prior to weight being added forward