Armide report Oct 15th 2018

Armide report Oct 15th 2018


Photos of recent works undertaken

  • Vent slots and deck beams with strip lighting switched on in the main saloon

  • Vent slots and deck beams with strip lighting switched on in the main saloon

  • Vent slots and deck beams with strip lighting switched on in the main saloon

  • New doors being primed for painting and varnishing

  • New doors being primed for painting and varnishing

  • Electric bulkhead light in aft cabin

  • Main saloon joinery

  • The passarelle

  • Adjusting the gas strut under the companionway steps

  • Adjusting the gas strut under the companionway steps

  • The passarelle

  • Instruments on the forward face of the doghouse

  • Lights in the doghouse

  • Lights in the doghouse

  • Forward face of the doghouse

  • Forward face of the doghouse

  • Piping under the sink in the galley with frames showing

  • Galley works

  • Galley works

  • Breast lines pulling Armide off the quayside

  • Breast lines pulling Armide off the quayside

Leave a Reply