Armide report Oct 15th 2018
Armide report Oct 15th 2018
Photos of recent works undertaken
-
Vent slots and deck beams with strip lighting switched on in the main saloon
-
Vent slots and deck beams with strip lighting switched on in the main saloon
-
Vent slots and deck beams with strip lighting switched on in the main saloon
-
New doors being primed for painting and varnishing
-
New doors being primed for painting and varnishing
-
Electric bulkhead light in aft cabin
-
Main saloon joinery
-
The passarelle
-
Adjusting the gas strut under the companionway steps
-
Adjusting the gas strut under the companionway steps
-
The passarelle
-
Instruments on the forward face of the doghouse
-
Lights in the doghouse
-
Lights in the doghouse
-
Forward face of the doghouse
-
Forward face of the doghouse
-
Piping under the sink in the galley with frames showing
-
Galley works
-
Galley works
-
Breast lines pulling Armide off the quayside
-
Breast lines pulling Armide off the quayside
Leave a Reply
You must be logged in to post a comment.