Armide report Oct 10th 2018

Armide report Oct 10th 2018


Photos of recent works undertaken

  • Temporary access steps

  • Alongside showing mast rake prior to final adjustments

  • Working afloat

  • Alongside showing mast rake prior to final adjustments

  • Masts details

  • Coming alongside following launching

  • Stanchion details

  • Lifeline works underway

  • Forehatch compass retainer

  • Varnishing preparations

  • Varnishing preparations

  • Cabin sole staining

  • Interior joinery detail in main saloon

  • Interior joinery details in the workshop

  • Works at the forward face of the doghouse interior

  • Works at the forward face of the doghouse interior

  • Interior detail at half skylight aft

  • Interior joinery detail in main saloon

  • Interior joinery details in the workshop

  • Mast in owners’ cabin

  • Temporary waterproofing at the mast base

  • Stern gland detail

  • Overhead light with cabling inside copper tubing

  • Forward face doghouse

  • Doghouse interior furniture

  • Electrical socket and USB key ports in interior joinery

  • Aft cabin lighting

  • Pulled off the quayside during easterly gale

Leave a Reply