Brass cowl vents installed on the starboard dorade box
-
Note grab bar attached to the compass pedestal
-
Aft deck works nearing completion with steering wheel installed for checks on the new pedestal.
-
Compass octagon with engine and bow-thruster controls
-
Compass octagon with engine and bow-thruster controls
-
Note grab bar attached to the compass pedestal
-
Skylight lifters installed with teak moulding strip at junction between skylight & deck beams
-
Skylight lifters installed with teak moulding strip at junction between skylight & deck beams
-
Oregon pine mast cover for the AIS GPS antenna
-
Installing the vent grilles flush in the interior joinery panels
-
Installing the vent grilles flush in the interior joinery panels
-
Hardware details on the doghouse doors
-
Powder coated gammon iron with bowsprit
-
Hardware details on the doghouse doors
-
Hardware details on the doghouse doors
-
Hardware details on the doghouse doors
-
Aft deck details showing steering wheel from aft
-
Interior panelling fresh from the paint cabin
-
... and aft deck grating installation
-
Masthead electronics with windex, navigation light and antenna.
-
Masthead electronics with windex, navigation light and antenna.
-
Masthead electronics with windex, navigation light and antenna.
-
Masthead electronics with windex, navigation light and antenna.
-
Beige rope cable cover
-
Deck light with Oregon pine cable cover
-
Aft grating reinforcing plate
-
... and inner forestay deck fitting during final installation
-
Cabling details at the chart table
-
Meljac light switch detail in the main saloon.
-
Stanchions, stanchion leg and lifelines installation
-
Stanchions, stanchion leg and lifelines installation