Armide report Sept 10th 2018

Armide report Sept 10th 2018


Photos of recent works undertaken

  • Aft deck grating

  • Aft deck grating feet assembly

  • Doghouse interior cabling

  • Aft deck benches control panel

  • Custom made longer skylight lifters

  • Aft deck works, pedestal, helmsman’s seat, side deck boxes (bains de soleil”) etc

  • Internal door frame fabrication

  • Internal door frame fabrication

  • Diverse interior and exterior panels in the painting and varnishing cycles

  • Diverse interior and exterior panels in the painting and varnishing cycles

  • Inboard end of spreaders and cable cover in oregon pine on the foremast.

  • Inboard end of spreaders and cable cover in oregon pine on the foremast.

  • Skylight glass protection bar holders being fitted

  • Port, starboard and aft lopolights on the capping rail

  • Skylight glass protection bar holders being fitted

  • Underside of aft hatch cover showing dogs and rubber seals

  • Port, starboard and aft lopolights on the capping rail

  • Port, starboard and aft lopolights on the capping rail

  • Extreme forward section of the bulwark and capping rail being painted and varnished

  • Extreme forward section of the bulwark and capping rail being painted and varnished

  • Spreader fittings with beige coloured rope cable cover

  • White painted spreader upper surfaces

  • Oyster white painted mast head with lopolight

  • Spreaders and electrical connection works on the spars outside the workshop

  • Aft deck shower and shore power connections in the side deck boxes at helm

  • Spreaders and electrical connection works on the spars outside the workshop

  • Aft deck shower and shore power connections in the side deck boxes at helm

  • Mast wedges for the foremast – exterior fitted precisely, interiors to adjust following stepping.