Armide report Sept 3rd 2018
Armide report Sept 3rd 2018
Photos of recent works undertaken
-
Masts being moved out of the workshop for completion works
-
Capping rail varnished
-
Helmsman’s seat base and two side boxes varnished and installed
-
Helmsman’s seat base and two side boxes varnished and installed
-
Helmsman’s seat base and two side boxes varnished and installed
-
Helmsman’s seat base and two side boxes varnished and installed, with compass pedestal
-
Gate opening between bronze stanchions and support legs
-
Detail at stanchion head prior to installing 7mm bronze rod lifelines
-
Lifeline terminal fitting installed on capping rail
-
Bronze stanchion and support leg installed with inserts in the capping rail
-
Combined steaming and deck light being positioned on the foremast
-
Masts set up on trestles outside the workshop
-
Deck protection during varnishing of the inside face of the bulwarks.
-
Starboard navigation light and bronze casing installed on the capping rail.
-
Construction of the aft deck grating
-
LED light installed under the aft capping rail
-
Manufacture of lengthened custom skylight lifters
-
Custom turned brass collar at the compass base.
Leave a Reply
You must be logged in to post a comment.