Armide report July 16th 2018
Photos of recent works undertaken
-
Topsides painting completed in Oyster White
-
Topsides painting completed in Oyster White
-
Topsides painting completed in Oyster White
-
Topsides spraying preparations
-
Compass binnacle octagon being varnished
-
Masking up the capping rail ready for topsides spraying
-
Bronze edging on the two aft deck hatches
-
Topsides spraying preparations
-
Aft deck furniture marked out on the deck prior to opening the deck at the skylights Masking up the capping rail ready for topsides spraying
-
Aft deck furniture marked out on the deck prior to opening the deck at the skylights Masking up the capping rail ready for topsides spraying
-
Topsides spraying preparations
-
Topsides spraying preparations
-
Aft deck bench being varnished
-
Doghouse bolting to deck
-
Topsides spraying preparations
-
Engine exhaust and generator exhaust skin fittings
-
Main engine exhaust skin fitting
-
Doghouse skylight installation and securing to doghouse side
-
Fitting out forward interior face of doghouse
-
Aft grating being built
-
Air extraction system for interior painting in forward cabin
-
Masking and protection in fore cabin, preparing for spray painting
-
Masking and protection in fore cabin, preparing for spray painting
-
Completed topsides spraying at porthole
2324 false false false
Leave a Reply
You must be logged in to post a comment.