Armide report July 16th 2018

Armide report July 16th 2018


Photos of recent works undertaken

  • Topsides painting completed in Oyster White

  • Topsides painting completed in Oyster White

  • Topsides painting completed in Oyster White

  • Topsides spraying preparations

  • Compass binnacle octagon being varnished

  • Masking up the capping rail ready for topsides spraying

  • Bronze edging on the two aft deck hatches

  • Topsides spraying preparations

  • Aft deck furniture marked out on the deck prior to opening the deck at the skylights Masking up the capping rail ready for topsides spraying

  • Aft deck furniture marked out on the deck prior to opening the deck at the skylights Masking up the capping rail ready for topsides spraying

  • Topsides spraying preparations

  • Topsides spraying preparations

  • Aft deck bench being varnished

  • Doghouse bolting to deck

  • Topsides spraying preparations

  • Engine exhaust and generator exhaust skin fittings

  • Main engine exhaust skin fitting

  • Doghouse skylight installation and securing to doghouse side

  • Fitting out forward interior face of doghouse

  • Aft grating being built

  • Air extraction system for interior painting in forward cabin

  • Masking and protection in fore cabin, preparing for spray painting

  • Masking and protection in fore cabin, preparing for spray painting

  • Completed topsides spraying at porthole

Leave a Reply