Armide report July 9th 2018

Armide report July 9th 2018


Photos of recent works undertaken

  • Plastic sheeting on the scaffolding to prevent dust

  • Plastic sheeting on the scaffolding to prevent dust

  • Plastic sheeting on the scaffolding to prevent dust

  • Bronze edge banding around one of the aft deck hatches

  • Main boom end fitting prior to installation

  • Helmsman’s seat and side deck boxes assembly

  • Helmsman’s seat and side deck boxes assembly

  • Helmsman’s seat and side deck boxes assembly

  • Helmsman’s seat and side deck boxes assembly

  • Helmsman’s seat and side deck boxes assembly

  • Helmsman’s seat and side deck boxes assembly

  • Template for aft deck grating, right hand option was selected

  • Custom bolts for Bulwark rail forward bracket let in to topsides

  • Custom bolts for Bulwark rail forward bracket

  • Bulwark rail forward bracket

  • Gammon iron stem band fitting following powder coating

  • Mock-up for anchor stowage chocks

  • Gammon iron stem band fitting following powder coating

  • Plastic sheeting placed around the stern by the topsides painters to prevent dust

  • Plastic sheeting placed around the stern by the topsides painters to prevent dust

  • Plastic sheeting around the hull placed by the topsides painters to prevent dust

  • Hawse pipes and bulwark rail bracket with completed capping rail forward section (removable)