Armide report July 2nd 2018

Armide report July 2nd 2018


Photos of recent works undertaken

  • Electrical supply conduits on the inside of the bulwarks

  • Electrical supply conduits on the inside of the bulwarks

  • Drawers in the owners’ cabin

  • Bronze mast fittings bedded and installed

  • Half skylights, gas bottle boxes and deck benches being installed.

  • Doghouse half skylight with cut outs in the deck

  • Skylight varnishing in the paint cabin

  • Deck bench half skylight cut out in the deck

  • One of two deck boxes to be fitted at the side of the helmsman’s seat.

  • Looking aft with compass pedestal, steering wheel and deck benches positioned.

  • Compass pedestal, deck bench and steering mechanism positioned

  • Mast head fitting with sail track

  • Bronze fitting for the stern light and ensign staff back from the foundry

  • Topsides hull painting being faired and checked

  • Interiors of the starboard dorade box and the half skylight at the doghouse

  • Aft capping rail fairlead during installation

  • Construction of one of the two dorade boxes either side of the doghouse

  • The gammon iron on the bowsprit being fitted prior to powder coating

  • Starboard whisker shroud hull plate during installation

  • Deck bollard with slot-less securing bolts bedded and installed

  • Interior of the starboard half skylight at the doghouse with the deck cut-outs

  • Cove line detail forward with hawse pipe removed during painting

  • Checking the aft grating template with rope between fairlead and bollards

  • Bronze section at the junction between the two halves of the helmsman’s seat

  • Upper and lower doghouse doors being installed

  • Deck bollard being installed next to mid-ship bulwark fairlead

  • Motor for main sheet winch on aft deck