Armide report July 2nd 2018
Photos of recent works undertaken
-
Electrical supply conduits on the inside of the bulwarks
-
Electrical supply conduits on the inside of the bulwarks
-
Drawers in the owners’ cabin
-
Bronze mast fittings bedded and installed
-
Half skylights, gas bottle boxes and deck benches being installed.
-
Doghouse half skylight with cut outs in the deck
-
Skylight varnishing in the paint cabin
-
Deck bench half skylight cut out in the deck
-
One of two deck boxes to be fitted at the side of the helmsman’s seat.
-
Looking aft with compass pedestal, steering wheel and deck benches positioned.
-
Compass pedestal, deck bench and steering mechanism positioned
-
Mast head fitting with sail track
-
Bronze fitting for the stern light and ensign staff back from the foundry
-
Topsides hull painting being faired and checked
-
Interiors of the starboard dorade box and the half skylight at the doghouse
-
Aft capping rail fairlead during installation
-
Construction of one of the two dorade boxes either side of the doghouse
-
The gammon iron on the bowsprit being fitted prior to powder coating
-
Starboard whisker shroud hull plate during installation
-
Deck bollard with slot-less securing bolts bedded and installed
-
Interior of the starboard half skylight at the doghouse with the deck cut-outs
-
Cove line detail forward with hawse pipe removed during painting
-
Checking the aft grating template with rope between fairlead and bollards
-
Bronze section at the junction between the two halves of the helmsman’s seat
-
Upper and lower doghouse doors being installed
-
Deck bollard being installed next to mid-ship bulwark fairlead
-
Motor for main sheet winch on aft deck