Armide report June 25th 2018
Photos of recent works undertaken
-
LED bulwark light in teak support dry fitted
-
LED bulwark light in teak support being installed
-
Bulwark fairlead
-
Doghouse door handle being fitted
-
The base of the compass pedestal with the pedestal cross section drawing
-
Bulwark fairlead
-
Oak joinery covering the main engine water-lock
-
Restored and polished forehatch hinge almost ready for re-installation
-
One of six bronze deck bollards being positioned and installed
-
Aligning and drilling off the compass pedestal base
-
Teak support block with bulwark lighting LED cable welded into place
-
Teak support blocks to take the bulwark lighting LED’s being varnished
-
Electrical supply conduit to the starboard navigation light position on the capping rail
-
Hub of the steering wheel being restored and adjusted
-
Hub of the steering wheel being restored and adjusted
-
Inner edge of the capping rail being radiused off prior to final shaping and sanding
-
Main mast head fitting being installed on the original mast
-
Openings in the deck being cut at the aft half skylights
-
Doghouse sliding hatch being fitted with sliders
-
Original propeller temporarily installed showing tight clearance
-
Original propeller temporarily installed showing tight clearance
-
Installing the mast fittings on a bed of arbokol mastic
-
Original propeller temporarily installed showing tight clearance
-
Owners motif and lettering in the transom prior to top coat painting
-
Foredeck from starboard showing hawse pipes, cove line, windlass and samson post.
-
Openings in the deck being cut at the aft half skylights
-
Foredeck from port showing hawse pipes, cove line, windlass and samson post.