Armide report June 25th 2018

Armide report June 25th 2018


Photos of recent works undertaken

  • LED bulwark light in teak support dry fitted

  • LED bulwark light in teak support being installed

  • Bulwark fairlead

  • Doghouse door handle being fitted

  • The base of the compass pedestal with the pedestal cross section drawing

  • Bulwark fairlead

  • Oak joinery covering the main engine water-lock

  • Restored and polished forehatch hinge almost ready for re-installation

  • One of six bronze deck bollards being positioned and installed

  • Aligning and drilling off the compass pedestal base

  • Teak support block with bulwark lighting LED cable welded into place

  • Teak support blocks to take the bulwark lighting LED’s being varnished

  • Electrical supply conduit to the starboard navigation light position on the capping rail

  • Hub of the steering wheel being restored and adjusted

  • Hub of the steering wheel being restored and adjusted

  • Inner edge of the capping rail being radiused off prior to final shaping and sanding

  • Main mast head fitting being installed on the original mast

  • Openings in the deck being cut at the aft half skylights

  • Doghouse sliding hatch being fitted with sliders

  • Original propeller temporarily installed showing tight clearance

  • Original propeller temporarily installed showing tight clearance

  • Installing the mast fittings on a bed of arbokol mastic

  • Original propeller temporarily installed showing tight clearance

  • Owners motif and lettering in the transom prior to top coat painting

  • Foredeck from starboard showing hawse pipes, cove line, windlass and samson post.

  • Openings in the deck being cut at the aft half skylights

  • Foredeck from port showing hawse pipes, cove line, windlass and samson post.