Armide report June 18th 2018
Photos of recent works undertaken
-
Porthole outer ring fairing
-
Topsides fairing
-
Gluing the two teak carvings into the transom
-
Port aft bulwark fairlead
-
View of cockpit area from aft with cockpit table mock-up in position
-
Gluing the capping rail into place
-
Compass pedestal and steering system alignment checks
-
Two teak carvings glued into place in the transom
-
Construction of side deck boxes at the helmsman’s seat
-
Cockpit table mock-up in place – for verification and discussion
-
Aft starboard bulwark fairlead with cove line details
-
Compass pedestal and steering system alignment checks
-
Masts and spars varnishing prior to fittings installation
-
Lower rudder bearing
-
Hawse pipes in the bulwark rails
-
Porthole outer ring fairing and painting
-
Upper rudder bearing
-
Bronze edging for the aft deck hatches bent to the correct curvature prior to welding
-
Bronze edging for the aft deck hatches bent to the correct curvature prior to welding
-
Joinery over the main engine water-lock in the aft cabin
-
Marking final positions for the helmsman’s seat and cockpit area benches
-
Holes for the bolts securing the doghouse prior to dowelling and varnishing
-
Domed nuts on the underside of eye bolts in the main mast collar
-
Half skylight at deck bench aft prior to cutting the opening in the deck
-
Preparing the fastenings and drilling of the aft fairleads on the capping rail
-
Preparing the fastenings and drilling of the forward fairleads on the capping rail
-
Compass binnacle octagon with engine control and bow-thruster joystick
-
Fore deck with hawse pipes, samson post and forward cap rail fairleads
-
Construction detail on low deck box at the helmsman’s seat
-
LED bulwark lighting supports in teak prior to varnishing
-
The spokes of the original steering wheel being adjusted to fit into the bronze hub.
2178 false false false