Armide report June 18th 2018

Armide report June 18th 2018


Photos of recent works undertaken

  • Porthole outer ring fairing

  • Topsides fairing

  • Gluing the two teak carvings into the transom

  • Port aft bulwark fairlead

  • View of cockpit area from aft with cockpit table mock-up in position

  • Gluing the capping rail into place

  • Compass pedestal and steering system alignment checks

  • Two teak carvings glued into place in the transom

  • Construction of side deck boxes at the helmsman’s seat

  • Cockpit table mock-up in place – for verification and discussion

  • Aft starboard bulwark fairlead with cove line details

  • Compass pedestal and steering system alignment checks

  • Masts and spars varnishing prior to fittings installation

  • Lower rudder bearing

  • Hawse pipes in the bulwark rails

  • Porthole outer ring fairing and painting

  • Upper rudder bearing

  • Bronze edging for the aft deck hatches bent to the correct curvature prior to welding

  • Bronze edging for the aft deck hatches bent to the correct curvature prior to welding

  • Joinery over the main engine water-lock in the aft cabin

  • Marking final positions for the helmsman’s seat and cockpit area benches

  • Holes for the bolts securing the doghouse prior to dowelling and varnishing

  • Domed nuts on the underside of eye bolts in the main mast collar

  • Half skylight at deck bench aft prior to cutting the opening in the deck

  • Preparing the fastenings and drilling of the aft fairleads on the capping rail

  • Preparing the fastenings and drilling of the forward fairleads on the capping rail

  • Compass binnacle octagon with engine control and bow-thruster joystick

  • Fore deck with hawse pipes, samson post and forward cap rail fairleads

  • Construction detail on low deck box at the helmsman’s seat

  • LED bulwark lighting supports in teak prior to varnishing

  • The spokes of the original steering wheel being adjusted to fit into the bronze hub.

Leave a Reply