Armide report May 28st 2018
Armide report May 28st 2018
Photos of recent works undertaken
-
Gammon iron pattern for the foundry
-
Laminating the capping rail across the stern
-
Fitting the teak knee between capping rails at the stern
-
Widening in the capping rail at the chainplates
-
Companion way step hinge being fitted
-
Steering system in place with auto pilot motor and chain
-
Routering out the underside of the capping rail for the electrical conduits
-
Plastic sheeting at the capping rail to contain topside fairing dust
-
Routering out the underside of the capping rail for the electrical conduits
-
Routering out the underside of the capping rail for the electrical conduits
-
Priming the transom with routered out sections for the name and owners motif
-
Hardening up the caulking below the waterline
-
Splines over electrical conduits in the main mast
-
Doghouse doors and interior joinery prior to installation
-
Main saloon joinery
-
Forward cabin
-
Owners bathroom
-
Chart table
-
Companionway steps
-
Aft half skylights ready to fit
-
Skylights copper drain tubes installed prior to varnishing
Leave a Reply
You must be logged in to post a comment.