Armide report May 28st 2018

Armide report May 28st 2018


Photos of recent works undertaken

  • Gammon iron pattern for the foundry

  • Laminating the capping rail across the stern

  • Fitting the teak knee between capping rails at the stern

  • Widening in the capping rail at the chainplates

  • Companion way step hinge being fitted

  • Steering system in place with auto pilot motor and chain

  • Routering out the underside of the capping rail for the electrical conduits

  • Plastic sheeting at the capping rail to contain topside fairing dust

  • Routering out the underside of the capping rail for the electrical conduits

  • Routering out the underside of the capping rail for the electrical conduits

  • Priming the transom with routered out sections for the name and owners motif

  • Hardening up the caulking below the waterline

  • Splines over electrical conduits in the main mast

  • Doghouse doors and interior joinery prior to installation

  • Main saloon joinery

  • Forward cabin

  • Owners bathroom

  • Chart table

  • Companionway steps

  • Aft half skylights ready to fit

  • Skylights copper drain tubes installed prior to varnishing

Leave a Reply