Armide report May 21st 2018
Armide report May 21st 2018
Photos of recent works undertaken
-
Oak shoe at aft end of keel to protect lower rudder bearing
-
Lead keel fairing and painting
-
Keel bolt plug
-
Bobstay fitting shaped to fit stem oak
-
Aft deck benches showing aft faces to take screens
-
Teak corner detail on an aft bench
-
Fabrictaing and bending the bronze edging for the aft deck hatches
-
Auto pilot chain at the steering mechanism
-
Auto pilot chain at the steering mechanism
-
Auto pilot chain at the steering mechanism
-
Phase 4 patterne sent to the foundry last week
-
Modifications to the forward face panel on the forehatch
-
Finishing details on the main companionway steps
-
Fitting of bronze copes at the corners of the samson post to prevent rope chafe
-
Half skylights for the doghouse and the aft deck
-
Interior joinery panelling
-
Measuring the capping rail for bulwark lighting and stanchion positions
-
Varnishing the forward skylight coaming
-
Aft skylight under construction in teak
-
Bronze hawse pipes prior to installation
-
Tube for black water breather let into main mast
-
Capping rail at chain-plates being prepared for shaping
-
Template for capping rail at stern with curved bronze aft cleats
-
Preparinglaminations for the capping rail across the stern
-
Marking the postion for the chain blocker and the naval pipe (to chain locker)