Armide report May 21st 2018

Armide report May 21st 2018


Photos of recent works undertaken

  • Oak shoe at aft end of keel to protect lower rudder bearing

  • Lead keel fairing and painting

  • Keel bolt plug

  • Bobstay fitting shaped to fit stem oak

  • Aft deck benches showing aft faces to take screens

  • Teak corner detail on an aft bench

  • Fabrictaing and bending the bronze edging for the aft deck hatches

  • Auto pilot chain at the steering mechanism

  • Auto pilot chain at the steering mechanism

  • Auto pilot chain at the steering mechanism

  • Phase 4 patterne sent to the foundry last week

  • Modifications to the forward face panel on the forehatch

  • Finishing details on the main companionway steps

  • Fitting of bronze copes at the corners of the samson post to prevent rope chafe

  • Half skylights for the doghouse and the aft deck

  • Interior joinery panelling

  • Measuring the capping rail for bulwark lighting and stanchion positions

  • Varnishing the forward skylight coaming

  • Aft skylight under construction in teak

  • Bronze hawse pipes prior to installation

  • Tube for black water breather let into main mast

  • Capping rail at chain-plates being prepared for shaping

  • Template for capping rail at stern with curved bronze aft cleats

  • Preparinglaminations for the capping rail across the stern

  • Marking the postion for the chain blocker and the naval pipe (to chain locker)