Armide report May 7th 2018
Armide report May 7th 2018
Photos of recent works undertaken
-
Primer on the bulwarks with rectangular capping rail fitted for checks
-
Chain locker with windlass motor above
-
Capping rail sections being built
-
Template for extreme forward piece for the capping rail
-
Template for the capping rail on the starboard side
-
Interior joinery being glued up
-
Joinery fitted round hanging knee with domed nut
-
Joinery at the chart table
-
Doghouse interior furniture
-
Doghouse interior furniture
-
Corner detail at doghouse roof margin
-
Joinery at the chart table
-
Aft capping rail fairleads prior to drilling
-
Hawse pipes, inner and outer
-
Main deck bollard (one of six)
-
Samson post corner protection pieces
-
Forward mast collar being fitted to the deck
-
Bow reinforcing in way of the hawse pipes
-
Cockpit area benches
-
Cockpit area benches
Leave a Reply
You must be logged in to post a comment.