Armide report April 30th 2018

Armide report April 30th 2018


Photos of recent works undertaken

  • >Spray application of Awlgrip Hullguard extra primer to the topsides

  • Awlgrip Fair filler being applied onto the Hullguard

  • 545 primer on the bulwark rail with teak capping rail dry fit in rectangular section

  • Selecting the teak for the capping rails using a plywood template

  • Long-boarding the filler on the topsides

  • Cutting the scarf in the end 0f section of capping rail teak.

  • Ply template showing the tenon positions over the bulwark stanchions in the capping rails

  • Forward bulwark reinforcing being glued into place

  • Fitting of teak shim under the aft mast deck collar.

  • Spreader fabrication from ash boards

  • Spreader fabrication from ash boards

  • Aft faces of teakdeck benches

  • Rule showing height required for bronze piece to go under the chain blocker

  • Bronze machine screws for securing under-shelf brackets to chain-plates

  • Teak blocking under windlass

  • Foundry patterns for navigation light bronze casings

  • Foundry pattern for combined stern light and ensign staff holder

  • Spline to cover conduit in mast at point where spar changes dimension

  • Conduits for electrical cabling in mainmast.

  • Interior joinery detail

  • Bonding of the doghouse teak roof

  • Main electrical control box behind panelling at chart table

  • Interior joinery detail

Leave a Reply