Armide report April 30th 2018
Photos of recent works undertaken
-
>Spray application of Awlgrip Hullguard extra primer to the topsides
-
Awlgrip Fair filler being applied onto the Hullguard
-
545 primer on the bulwark rail with teak capping rail dry fit in rectangular section
-
Selecting the teak for the capping rails using a plywood template
-
Long-boarding the filler on the topsides
-
Cutting the scarf in the end 0f section of capping rail teak.
-
Ply template showing the tenon positions over the bulwark stanchions in the capping rails
-
Forward bulwark reinforcing being glued into place
-
Fitting of teak shim under the aft mast deck collar.
-
Spreader fabrication from ash boards
-
Spreader fabrication from ash boards
-
Aft faces of teakdeck benches
-
Rule showing height required for bronze piece to go under the chain blocker
-
Bronze machine screws for securing under-shelf brackets to chain-plates
-
Teak blocking under windlass
-
Foundry patterns for navigation light bronze casings
-
Foundry pattern for combined stern light and ensign staff holder
-
Spline to cover conduit in mast at point where spar changes dimension
-
Conduits for electrical cabling in mainmast.
-
Interior joinery detail
-
Bonding of the doghouse teak roof
-
Main electrical control box behind panelling at chart table
-
Interior joinery detail
2046 none none true true true Close Next Previous The requested content cannot be loaded. Please try again later.
Leave a Reply
You must be logged in to post a comment.