Armide report April 23rd 2018
Photos of recent works undertaken
-
Aligning and fitting the windlass, naval pipe and chain blocker
-
Rigging screw tensioner between deck and stem under forestay fitting
-
Reinforcing of the bulwarks in way of the midship fairlead (starboard side).
-
Reinforcing of the bulwarks in way of the midship fairlead (starboard side).
-
Reinforcing of the bulwarks in way of the midship fairlead (starboard side).
-
Plywood template for the capping rail around the stern
-
Transom profile (not fully completed) with capping rail template in place
-
Interior joinery, painted and varnished
-
Interior corner detail at aft hatch guttering
-
Interior joinery, painted and varnished
-
Interior joinery, painted and varnished
-
Interior joinery, painted and varnished
-
Interior joinery, painted and varnished
-
Fabricated under-shelf bracket on chain-plate at the chart table
-
Fabricated under-shelf brackets on chain-plates at the chart table
-
Doghouse roof plywood routered out to take electrical conduits
-
Dry fitting of furniture on forward interior face of doghouse
-
Teak deck bench for cockpit area
-
Steering mechanism with auto pilot motor in place
-
Windlass motor in forepeak
1927 none none true true true Close Next Previous The requested content cannot be loaded. Please try again later.
Leave a Reply
You must be logged in to post a comment.