Armide report April 16th 2018
Photos of recent works undertaken
-
Jig for checking radius of bronze tube around perimeter of steering wheel
-
Bronze tube being checked on jig for correct curvature around perimeter of wheel
-
3rd 6mm plywood layer being bonded to the roof of the doghouse.
-
Hull topsides filled and primed with Awlgrip 545.
-
Bronze cranse iron being fitted to forward end of bowsprit
-
Bronze cranse iron being fitted to forward end of bowsprit
-
Forward section of starboard bulwark rail being positioned
-
Bulwark rails from forward
-
Routering in spars to take ducts for electrical cabling and breather tubes
-
Routering in spars to take ducts for electrical cabling and breather tubes
-
Routering in spars to take ducts for electrical cabling and breather tubes
-
Bulwark rails at stem
-
View down into engine room, galley and technical space with the doghouse off
-
Electrical cabling ducts let into interior panelling
-
Electrical cabling ducts let into interior panelling
-
Interior joinery panelling and ventilation slots
-
Patterns for under-shelf brackets for the chainplates – en route for the foundry
-
Patterns for under-shelf brackets for the chainplates – en route for the foundry
-
View forward showing lower fitting to take forestay tension on stem
-
Bronze bobstay fitting installed on primed topsides.