Armide report April 16th 2018

Armide report April 16th 2018


Photos of recent works undertaken

  • Jig for checking radius of bronze tube around perimeter of steering wheel

  • Bronze tube being checked on jig for correct curvature around perimeter of wheel

  • 3rd 6mm plywood layer being bonded to the roof of the doghouse.

  • Hull topsides filled and primed with Awlgrip 545.

  • Bronze cranse iron being fitted to forward end of bowsprit

  • Bronze cranse iron being fitted to forward end of bowsprit

  • Forward section of starboard bulwark rail being positioned

  • Bulwark rails from forward

  • Routering in spars to take ducts for electrical cabling and breather tubes

  • Routering in spars to take ducts for electrical cabling and breather tubes

  • Routering in spars to take ducts for electrical cabling and breather tubes

  • Bulwark rails at stem

  • View down into engine room, galley and technical space with the doghouse off

  • Electrical cabling ducts let into interior panelling

  • Electrical cabling ducts let into interior panelling

  • Interior joinery panelling and ventilation slots

  • Patterns for under-shelf brackets for the chainplates – en route for the foundry

  • Patterns for under-shelf brackets for the chainplates – en route for the foundry

  • View forward showing lower fitting to take forestay tension on stem

  • Bronze bobstay fitting installed on primed topsides.