Armide report April 9th 2018

Armide report April 9th 2018


Photos of recent works undertaken

  • Routering out for cable conduits in the spars

  • Cockpit benches assembly

  • Cockpit benches assembly

  • Fairing in the stern post to the rudder blade

  • Cranse iron ready for fitting to the bowsprit (behind)

  • Copper rived and chain-plate bolt heads filled

  • Copper rived and chain-plate bolt heads primed and prepared for filling

  • Copper rived and chain-plate bolt heads filled

  • Cockipit eating benches prior to assembly

  • Oak interior joinery panels prepared for varnishing

  • Bulwark railwith scuppers cut at stanchions and between stanchions

  • Bulwark rail scuppers cut at stanchions and between stanchions

  • Scupper inbulwark rail at chain-plates

  • Teak stem-head piece with hollow to take underside of bowsprit

  • Routering out for cable conduits in the spars

Leave a Reply