Armide report April 4th 2018

Armide report April 4th 2018


Photos of recent works undertaken

  • Engine and generator exhaust outlet skin fittings

  • Original steering mechanism connected to new stock

  • Rudder trunk at deck

  • Paint team shot-blasting the rivet and bolt heads in the topsides.

  • Rudder in place for checks

  • Rudder in place for checks

  • Gantry on deck for lifting the rudder into position

  • Port doghouse skylight showing no margin at skylight

  • Doghouse camber being checked and adjusted

  • Doghouse securing bolts being installed

  • Doghouse securing bolts being installed

  • Doghouse securing bolts being installed

  • Port bulwark rail forward section being installed and checked

  • Port bulwark rail forward section in place for marking scuppers

  • Port bulwark rail forward section in place for marking scuppers and bow angles

Leave a Reply