Armide report April 4th 2018
Armide report April 4th 2018
Photos of recent works undertaken
-
Engine and generator exhaust outlet skin fittings
-
Original steering mechanism connected to new stock
-
Rudder trunk at deck
-
Paint team shot-blasting the rivet and bolt heads in the topsides.
-
Rudder in place for checks
-
Rudder in place for checks
-
Gantry on deck for lifting the rudder into position
-
Port doghouse skylight showing no margin at skylight
-
Doghouse camber being checked and adjusted
-
Doghouse securing bolts being installed
-
Doghouse securing bolts being installed
-
Doghouse securing bolts being installed
-
Port bulwark rail forward section being installed and checked
-
Port bulwark rail forward section in place for marking scuppers
-
Port bulwark rail forward section in place for marking scuppers and bow angles
Leave a Reply
You must be logged in to post a comment.