Armide report March 26th 2018

Armide report March 26th


Photos of recent works undertaken

  • Bulwark rail being cut out from teak boards

  • Bulwark rail temporarily in place with scupper marks for checking

  • Bulwark rail being cut out from teak boards

  • Interior joinery panelling

  • Opening in lazarette panelling to make way for exhaust skin fittings (main & generator).

  • Blocking at porthole being painted white.

  • Cockpit area skylights under construction

  • Cockpit seating benches under construction

  • Guttering being built into aft deck hatches

  • Guttering being built into aft deck hatches

  • Doghouse roof being installed

  • Doghouse roof being installed

  • Galley detail

  • Galley detail

  • Iroko plug epoxied into underside of lead keel to plug keel bolt hole.

Leave a Reply