Armide report March 12th 2018
Armide report March 12th 2018
Photos of recent works undertaken
-
Doghouse being lifted onto the deck
-
Deck sanded (40 grit) with doghouse in position
-
Deck sanded (40 grit) with doghouse in position
-
Doghouse being lifted onto the deck
-
Doghouse and skylights in position for checks
-
Copper sheet at lower part of rudder stock where antifouling paint application is not possible
-
Checking porthole ring for fit to the curvature of the hull
-
Rudder with cut-out for propeller, epoxy impregnated to protect wood from prop wash
-
Adjusting porthole ring to fit the curvature of the hull
-
Dome headed bronze nuts on the hanging knees
-
Adjusting porthole ring to fit the curvature of the hull
-
Dome headed bronze nuts on the hanging knees
-
Porthole in captain’s cabin bathroom
-
Battery installation in owners’ cabin
-
Teak stowage at forward face of doghouse interior
-
Galley joinery and work surface
-
Captain’s cabin bathroom joinery prior to painting and varnishing
-
Teak stowage at forward face of doghouse interior
-
Rubber caulking round base of oak bulwark stanchion.
-
GRP rudder trunk tube fitted and secured
-
GRP rudder trunk tube fitted and secured
-
Bronze rudder stock head showing keys to prevent turning on the iroko stock
-
Original steering mechanism fitting with connection piece to new rudder stock head.