Armide report March 5th 2018

Armide report March 5th 2018


Photos of recent works undertaken

 

  • Oak blocking at mainmast drilled off prior to opening the hole for the mainmast.

  • Mainmast model above and below decks looking aft

  • Phase three patterns for the foundry

  • Phase three patterns for the foundry

  • Phase three patterns for the foundry

  • Bronze domed nut on porthole

  • Mainmast model in place looking aft from forward part of main saloon

  • Mainmast model in place looking aft with owners cabin aft port bulkhead

  • Propeller aperture rounded off

  • Bronze domed nut on hanging knee

  • Cutting the propeller aperture in the rudder blade

  • Owners bathroom custom GRP shower tray prior to painting

  • Cable exits at ducting

  • Batteries and battery box

  • Main engine waterlock

  • Routering the caulking groove at an oak bulwark stanchion

  • Oak bulwark stanchion rounded off, varnished and fitted prior to caulking

  • Interior joinery components prior to painting and varnishing

  • Bulwark stanchions sanded, painted and varnished prior to installation

  • Teak deck boxes under construction

  • Porthole showing amount to be adjusted top and bottom depending on position along the hull