Armide report February 26th 2018
Photos of recent works undertaken
-
Routered grooves for the cabling ducts in main saloon bulkhead
-
Electrical cabling ducts embedded into the main saloon bulkhead
-
Lower rudder bearing
-
Main saloon bulkhead panelling
-
Routered grooves for the cabling ducts
-
Lower rudder bearing
-
v
-
Aft cabin heads joinery with sink temporarily placed for checks
-
Aft cabin heads joinery
-
Chart table
-
Galley
-
Generator beds above main engine
-
Mock-up of main mast and heel tenon prior to installation checks
-
Oak interior joinery panel and brass hinges
-
Installation of insulation panels in the technical space