Armide report February 26th 2018

Armide report February 26th 2018


Photos of recent works undertaken

  • Routered grooves for the cabling ducts in main saloon bulkhead

  • Electrical cabling ducts embedded into the main saloon bulkhead

  • Lower rudder bearing

  • Main saloon bulkhead panelling

  • Routered grooves for the cabling ducts

  • Lower rudder bearing

  • v

  • Aft cabin heads joinery with sink temporarily placed for checks

  • Aft cabin heads joinery

  • Chart table

  • Galley

  • Generator beds above main engine

  • Mock-up of main mast and heel tenon prior to installation checks

  • Oak interior joinery panel and brass hinges

  • Installation of insulation panels in the technical space