Armide report February 5th 2018

Armide report February 5th 2018


Photos of recent works undertaken

  • Original steering mechanism set up on deck for checks and measurements

  • Stern tube and prop shaft installation

  • stern gland and prop shaft at entry into the stern post. Limber hole lines also visible

  • Lower rudder bearing tack welded

  • Deep batten on port side for sheer-line and wooden stanchion checks

  • Lower rudder bearing during welding

  • Doghouse teak deck beams, carlins and half beams

  • Main steps detail at top in doghouse

  • Edge protection prior to trimming of doghouse steps

  • Doghouse steps being trimmed on a table saw

  • Oak interior joinery with ventilation slots.

  • Oak interior joinery with ventilation slots - back view.

  • Oak interior joinery with ventilation slots.

  • Oak interior joinery with ventilation slots - back view.

  • Main saloon bulkhead forward starboard

  • Electrical cabling installation at chart table

  • Drawers in owners' cabin

  • Bobstay fitting cut-out in stem

  • Veneering on underside of doghouse roof

  • Gueuses installées avant la demande d’isolation du plomb

  • Hull filling at flat zones in the topsides

  • Contre plaqué haut de serre

  • Contre plaqué de 15mm collé étanche

  • Contre plaqué bas sous serre collé étanche

Leave a Reply