Armide report February 5th 2018
Photos of recent works undertaken
-
Original steering mechanism set up on deck for checks and measurements
-
Stern tube and prop shaft installation
-
stern gland and prop shaft at entry into the stern post. Limber hole lines also visible
-
Lower rudder bearing tack welded
-
Deep batten on port side for sheer-line and wooden stanchion checks
-
Lower rudder bearing during welding
-
Doghouse teak deck beams, carlins and half beams
-
Main steps detail at top in doghouse
-
Edge protection prior to trimming of doghouse steps
-
Doghouse steps being trimmed on a table saw
-
Oak interior joinery with ventilation slots.
-
Oak interior joinery with ventilation slots - back view.
-
Oak interior joinery with ventilation slots.
-
Oak interior joinery with ventilation slots - back view.
-
Main saloon bulkhead forward starboard
-
Electrical cabling installation at chart table
-
Drawers in owners' cabin
-
Bobstay fitting cut-out in stem
-
Veneering on underside of doghouse roof
-
Gueuses installées avant la demande d’isolation du plomb
-
Hull filling at flat zones in the topsides
-
Contre plaqué haut de serre
-
Contre plaqué de 15mm collé étanche
-
Contre plaqué bas sous serre collé étanche