Armide report January 29th 2018
Photos of recent works undertaken
-
Cupboard mock-up in captain’s cabin
-
Owners’ cabin shower tray fabrication
-
Two 12mm bronze chain-plates to the right of one cast bronze hanging knee
-
Brass hinges on oak joinery
-
Fabrication of GRP shower tray in owners’ cabin using the hull and sole beams as the mould.
-
Crew bathroom bulkhead installation
-
Dry fit prior to drilling of forward cast bronze floor
-
Hull fairing team
-
Doghouse deck-beams installation
-
Doghouse deck-beams installation
-
Teak veneered doghouse steps
-
Doghouse steps detail with insulated plywood core (over engine)
-
Oak interior joinery
-
Oak interior joinery