Photos of recent works undertaken

  • Cupboard mock-up in captain’s cabin

  • Owners’ cabin shower tray fabrication

  • Two 12mm bronze chain-plates to the right of one cast bronze hanging knee

  • Brass hinges on oak joinery

  • Fabrication of GRP shower tray in owners’ cabin using the hull and sole beams as the mould.

  • Crew bathroom bulkhead installation

  • Dry fit prior to drilling of forward cast bronze floor

  • Hull fairing team

  • Doghouse deck-beams installation

  • Doghouse deck-beams installation

  • Teak veneered doghouse steps

  • Doghouse steps detail with insulated plywood core (over engine)

  • Oak interior joinery

  • Oak interior joinery