Armide report January 15th 2018

Armide report January 15th 2018


Photos of recent works undertaken

  • Bronze spar fittings from Dryade

  • Engine and generator in place

  • Bronze spar fittings from Dryade

  • Bronze spar fittings from Dryade

  • Bronze spar fittings from Dryade

  • Covering board templates on foredeck

  • Chain-plate installation

  • Varnish works on the spars

  • Bronze spar fittings from Dryade

  • Bronze deck fittings including inner forestay, bobstay and bowsprit whisker shroud plates.

  • Teak covering board routered out for deck inserts at chain-plates.

  • Technical space starboard aft

  • Chain-plate and deck insert prior to installation

  • Tank connections

  • Teak skylight central rail with guttering

  • Teak skylight central rail with guttering let in to end walls

  • Main saloon skylight with coaming

  • Chain-plates following drilling and bending to correct angles

    Chain-plates following drilling and bending to correct angles

Leave a Reply