Armide report January 15th 2018
Photos of recent works undertaken
-
Bronze spar fittings from Dryade
-
Engine and generator in place
-
Bronze spar fittings from Dryade
-
Bronze spar fittings from Dryade
-
Bronze spar fittings from Dryade
-
Covering board templates on foredeck
-
Chain-plate installation
-
Varnish works on the spars
-
Bronze spar fittings from Dryade
-
Bronze deck fittings including inner forestay, bobstay and bowsprit whisker shroud plates.
-
Teak covering board routered out for deck inserts at chain-plates.
-
Technical space starboard aft
-
Chain-plate and deck insert prior to installation
-
Tank connections
-
Teak skylight central rail with guttering
-
Teak skylight central rail with guttering let in to end walls
-
Main saloon skylight with coaming
-
Chain-plates following drilling and bending to correct angles
1628 false false false
Leave a Reply
You must be logged in to post a comment.