Armide report January 2nd 2018

Armide report January 2nd 2018


Photos of recent works undertaken

  • Teak deck margins being fitted round hatch openings.

  • The teak arch-board at the stern – dry fitting checks

  • Lead ingots for the forepeak ballast

  • Lead ingots bolted to the outboard surfaces of the bilge stringers in the forepeak

  • Joinery detail in the owners’ cabin – solid oak

  • Joinery detail in the owners’ cabin – solid oak

  • Teak detail from the doghouse construction

  • Teak detail from the doghouse construction

  • Teak skylights under construction

  • Copper riveting the bronze strap to the rudder blade

  • Bronze lower rudder bearing being fitted prior to assembly and welding

  • Rudder slot in deck being checked for alignment

  • Bow-thruster fairing piece in foam-cored GRP

  • Main saloon joinery

  • Bronze skin fitting at aft port quarter being dry fitted

  • Sipo fairing pieces being attached to hull at hollow areas in topsides

Leave a Reply