Armide report December 18th 2017

Armide report December 18th 2017


Photos of recent works undertaken

  • Chain locker looking forward.

  • Forward teak king plank on the foredeck – dry fitting prior to gluing.

  • Forward teak king plank detail prior to gluing to deck plywood.

  • Aft king plank being cut from one length of teak using plywood template.

  • Foam fairing at leading edge of bow-thruster tunnel, starboard side shown, prior to glassing.

  • GRP laminates being applied to bow-thruster tunnel fairing pieces.

  • Mock-up of forward interior façade of doghouse showing computer screen and provisional positioning of navigation light display panel. The clock and barometer possibly above the display panel.

  • Doghouse teak dry assembly

  • Doghouse teak joinery works

  • One of two bronze rudder straps bent to pass through the blade and round the stock

  • Bronze lower rudder bearing dry assembly prior to assembly and welding

  • Sample lifeline end fitting and 6mm bronze rod lifeline.

  • Grey water tank bronze outlet seacock - positioning on oak reinforcing plate.

  • Electrical conduit passing through cut-out in bulkhead

  • Galley joinery

  • Interior panels being prepared for painting in the paint cabin

Leave a Reply