Armide report December 18th 2017
Photos of recent works undertaken
-
Chain locker looking forward.
-
Forward teak king plank on the foredeck – dry fitting prior to gluing.
-
Forward teak king plank detail prior to gluing to deck plywood.
-
Aft king plank being cut from one length of teak using plywood template.
-
Foam fairing at leading edge of bow-thruster tunnel, starboard side shown, prior to glassing.
-
GRP laminates being applied to bow-thruster tunnel fairing pieces.
-
Mock-up of forward interior façade of doghouse showing computer screen and provisional positioning of navigation light display panel. The clock and barometer possibly above the display panel.
-
Doghouse teak dry assembly
-
Doghouse teak joinery works
-
One of two bronze rudder straps bent to pass through the blade and round the stock
-
Bronze lower rudder bearing dry assembly prior to assembly and welding
-
Sample lifeline end fitting and 6mm bronze rod lifeline.
-
Grey water tank bronze outlet seacock - positioning on oak reinforcing plate.
-
Electrical conduit passing through cut-out in bulkhead
-
Galley joinery
-
Interior panels being prepared for painting in the paint cabin
1625 false false false
Leave a Reply
You must be logged in to post a comment.