Armide report December 11th 2017
Armide report December 11th 2017
Photos of recent works undertaken
-
Bronze strap on rudder blade being drilled through for copper rivets
-
Bronze strap being rounded off prior to dry fitting
-
GRP rudder trunk in two parts ready for installation
-
Aft deck marked up for deck hatch margins choice – right hand one chosen, no margins.
-
Laminated oak blocks to be installed on hull at skin fittings
-
Cabinet makers work-in-progress sketch of main saloon starboard side.
-
Teak dowels for all silicon bronze woodscrews
-
Mainmast being sanded and faired
-
King plank zone being routered out in aft deck strakes
-
King plank zone being routered out in aft deck strakes
-
Deck edge overlap above sheer strake showing amount to be filled in and faired
-
Cutting list prepared for teak doghouse
-
Electrical conduit running through bulkhead
Leave a Reply
You must be logged in to post a comment.