Armide works photo report May 2017

Armide works photo report May 2017

Photos of recent works undertaken

  • New lead keel being positioned under hull

  • New varnished laminated oak deck beams

  • Plywood guides to assist with drilling the lead keel bolts

  • Drilling the holes for the new bronze lead keel bolts

  • New deck beams in place

  • Hanging knee pattern being made in sipo

  • Hanging knee pattern

  • New lead keel being positioned under hull

Leave a Reply