Armide works photo report Mar 2017
Armide works photo report Mar 2017
Photos of recent works undertaken
-
Wooden floors on the wooden keel with new garboard
-
Templates to assist with drawing for new lead keel
-
Plug for new lead keel
-
Keel plug in box en route for the foundry for casting for new lead keel
-
Old deck fully removed and temporary steel beams installed
-
Interior cross bracing to support hull when suspended during keel swap
-
Plywood patterns for the bronze floors
Leave a Reply
You must be logged in to post a comment.