Armide works photo report Mar 2017

Armide works photo report Mar 2017

Photos of recent works undertaken

  • Wooden floors on the wooden keel with new garboard

  • Templates to assist with drawing for new lead keel

  • Plug for new lead keel

  • Keel plug in box en route for the foundry for casting for new lead keel

  • Old deck fully removed and temporary steel beams installed

  • Interior cross bracing to support hull when suspended during keel swap

  • Plywood patterns for the bronze floors

Leave a Reply