Armide works photo report Jan 2017

Armide works photo report Jan 2017

Photos of recent works undertaken

  • New cast bronze floor in forward section of the hull

  • New oak deck beam being laminated with epoxy resin

  • Moulds with correct camber for new oak deck beam laminating

  • New oak clamp under the old beam shelf

  • Propeller aperture being laminated in oak with epoxy glue

  • New sipo sheer-strake with old covering boards removed

  • Old covering boards and part of sheer-strake removed

  • Setting up the centreline for the stern tube with new frames port and starboard

  • Covering boards and sheer-strake removed for replacement

  • Templates for all 5 forward bronze floors

  • Template for forward bronze floor

  • Templates packed for sending to foundry

  • New cast bronze floor in forward section of the hull

Leave a Reply