Armide works photo report Nov 2016.
Photos of recent works undertaken
-
Installation of new oak bilge stringer
-
Repair works to inboard surface of stem
-
Repair works to inboard surface of stem
-
Wooden keel, old wooden floor and old keel bolts with new frames
-
Sipo timber for topsides planking
-
New sipo planking in topsides at butt onto grown frame
-
Bilge stringers at bow
-
Hull with garboard removed on the port side showing all frame heels
-
Hull with garboard removed on the port side showing all frame heels
-
Construction of the steel cradle for lead keel removal
-
Sanding the new sipo topside planking
-
New section of oak bilge stringer on starboard forward side
1614 false false false
Leave a Reply
You must be logged in to post a comment.