Armide works photo report Nov 2016

Armide works photo report Nov 2016.

Photos of recent works undertaken

  • Installation of new oak bilge stringer

  • Repair works to inboard surface of stem

  • Repair works to inboard surface of stem

  • Wooden keel, old wooden floor and old keel bolts with new frames

  • Sipo timber for topsides planking

  • New sipo planking in topsides at butt onto grown frame

  • Bilge stringers at bow

  • Hull with garboard removed on the port side showing all frame heels

  • Hull with garboard removed on the port side showing all frame heels

  • Construction of the steel cradle for lead keel removal

  • Sanding the new sipo topside planking

  • New section of oak bilge stringer on starboard forward side

Leave a Reply