ARMIDE works update – 20th November 2017
Photos of recent works undertaken
-
Teak deck laying from forward with caulking of seams in progress
-
Porthole dry fit to check angles
-
Teak arch-board laminates in production – for aft end of deck above transom
-
Moulding the inside of the lower part of the rudder tube/trunk prior to tube installation
-
Iroko infill to take the lower part of the rudder trunk
-
Cutting the bronze bar for the lower rudder bearing
-
Lower rudder bearing in bronze and delryn mid-bearings
-
Eye on foremast mast step to take tie-bar under mainmast forestay attachment point
-
Mortices and tenons in the doghouse skylight lids.
-
Battery box interior laminating.
-
100m of 13mm anchor chain
-
Hull showing bow-thruster openings taken from forward.
-
Sample cabin lights for owners to check out during next visit
1345 false false false
Leave a Reply