ARMIDE works update – 20th November 2017

ARMIDE works update – 20th November 2017

Photos of recent works undertaken

  • Teak deck laying from forward with caulking of seams in progress

  • Porthole dry fit to check angles

  • Teak arch-board laminates in production – for aft end of deck above transom

  • Moulding the inside of the lower part of the rudder tube/trunk prior to tube installation

  • Iroko infill to take the lower part of the rudder trunk

  • Cutting the bronze bar for the lower rudder bearing

  • Lower rudder bearing in bronze and delryn mid-bearings

  • Eye on foremast mast step to take tie-bar under mainmast forestay attachment point

  • Mortices and tenons in the doghouse skylight lids.

  • Battery box interior laminating.

  • 100m of 13mm anchor chain

  • Hull showing bow-thruster openings taken from forward.

  • Sample cabin lights for owners to check out during next visit