ARMIDE works update – 13th November 2017
Photos of recent works undertaken
-
GRP rudder trunk upper and lower sections ready for dry fitting
-
Teak deck laying at bow – 10 strakes per side glued down
-
Measuring deck plywood surface temperatures – 6.9°c showing
-
Teak doghouse skylight under construction
-
Dovetail joints on teak doghouse skylight under construction
-
Porthole infills treated and ready for installation
-
Porthole opening cut into topsides and hull treated ready for sipo infill
-
Part of teak arch-board to go round extreme aft section of hull at deck level
-
New stainless steel drip tray ready for installation
-
Bow-thruster epoxy fairing
-
Mock-ups of various pieces of equipment to help with construction of interior joinery
-
Possible style for lower part of pedestal just forward of helm position – to be discussed.
-
Possible fitting to be used on removable table at helm position – to be discussed.