ARMIDE works update – 13th November 2017

ARMIDE works update – 13th November 2017

Photos of recent works undertaken

  • GRP rudder trunk upper and lower sections ready for dry fitting

  • Teak deck laying at bow – 10 strakes per side glued down

  • Measuring deck plywood surface temperatures – 6.9°c showing

  • Teak doghouse skylight under construction

  • Dovetail joints on teak doghouse skylight under construction

  • Porthole infills treated and ready for installation

  • Porthole opening cut into topsides and hull treated ready for sipo infill

  • Part of teak arch-board to go round extreme aft section of hull at deck level

  • New stainless steel drip tray ready for installation

  • Bow-thruster epoxy fairing

  • Mock-ups of various pieces of equipment to help with construction of interior joinery

  • Possible style for lower part of pedestal just forward of helm position – to be discussed.

  • Possible fitting to be used on removable table at helm position – to be discussed.