ARMIDE works update – 30th October 2017

ARMIDE works update – 30th October 2017

Photos of recent works undertaken

  • Some of the completed patterns including bobstay fitting (third from left)

  • Sikaflex glue being applied for teak deck bonding to plywood sub-deck

  • Patternmaking – final touches to the inner forestay deck fitting

  • Jig for clamping scarfs in new teak decking

  • Hawse pipe patterns interior and exterior (with tube attached)

  • Scarfs in teak deck planking being prepared with biscuit joints to strengthen scarfs

  • Final glassing on outside of bow-thruster tunnel

  • Porthole hull support in sipo in main saloon between glass-fronted cabinets

  • Dry fitting of porthole hull support in sipo alongside bronze hanging knee

  • Mould for making fibre-glass rudder tube in two parts

  • Restored forehatch with simulated window panels for owner approval

  • Glassed-in bow-thruster tunnel looking forward

  • Full size doghouse sections drawn out onto plywood prior to construction

  • Adjustments to bunk front mock up in owners’ cabin – port side, taken from forward

  • Panels round engine compartment temporarily positioned. Looking from forward

  • Proposal for design of ventilation slots in main saloon above original joinery sections

  • Teak decking laid onto plywood – 3 strakes per side glued down