ARMIDE works update – 30th October 2017
Photos of recent works undertaken
-
-
Some of the completed patterns including bobstay fitting (third from left)
-
Sikaflex glue being applied for teak deck bonding to plywood sub-deck
-
Patternmaking – final touches to the inner forestay deck fitting
-
Jig for clamping scarfs in new teak decking
-
Hawse pipe patterns interior and exterior (with tube attached)
-
Scarfs in teak deck planking being prepared with biscuit joints to strengthen scarfs
-
Final glassing on outside of bow-thruster tunnel
-
Porthole hull support in sipo in main saloon between glass-fronted cabinets
-
Dry fitting of porthole hull support in sipo alongside bronze hanging knee
-
Mould for making fibre-glass rudder tube in two parts
-
Restored forehatch with simulated window panels for owner approval
-
Glassed-in bow-thruster tunnel looking forward
-
Full size doghouse sections drawn out onto plywood prior to construction
-
Adjustments to bunk front mock up in owners’ cabin – port side, taken from forward
-
Panels round engine compartment temporarily positioned. Looking from forward
-
Proposal for design of ventilation slots in main saloon above original joinery sections
-
Teak decking laid onto plywood – 3 strakes per side glued down